water plant disinfectant project in Fuzhou, Fujian

Views: 37     Author: Site Editor     Publish Time: 2019-01-14      Origin: Site

HADA win a water plant disinfectant process project bid  in Fuzhou, Fujian


Our company win a water plant disinfectant process project bid in Fuzhou, Fujian on December 20th, 2016. We have completed the supply, installation and commissioning in September 2017 (construction including on-site renovation, floor laying, original equipment docking and dismantling). It has been put into use by the factory and has been used well. It was completed in September 2017.

Time of winning: 2016.12

Complete time: 2017.09

Equipment Name: Split type automatic electrolyzed brine type sodium hypochlorite generator

Preparation liquid concentration: 8000ppm

Chlorine dosage: 2ppm

Function: chlorination in clear water tank

Salting cycle: 7-15 days

Operation mode: fully automatic operation / Ethernet communication remote control


Chlorine injection method: flow value + online residual chlorine value → PLC → variable frequency signal → variable frequency pump ( dosing by closed loop feedback &variable frequency dosing )